Why this page exists

Buying steel from China means trusting what you never see. So we show it: real photos from our daily loading and delivery runs — the same evidence pack (loading photos, videos, MTC, inspection reports) that accompanies every Nikasteel order, from 5-ton trial containers upward.

H beam loading — Foshan warehouse district

H beam bundles loaded on a flatbed truck in Foshan, ready for the port leg
H beam bundles strapped and staked on a flatbed for the short domestic leg to the container yard. Long beams travel on flatbeds with steel stakes; every bundle is weighed before loading.

Warehouse stock — H beam & channel

H beam and channel steel stock in the Nikasteel Foshan warehouse
Part of our Foshan warehouse network: GB and standard-size H beam and channel stock, ready for cutting or direct loading. Stocked sizes ship in 7–15 days.

Galvanized square tubes staged for loading

Galvanized square and rectangular steel tubes bundled on a truck
Galvanized square and rectangular hollow sections, bundled and staged for loading. GI tubes and MA tubes ship mixed in one container on request.

Tube delivery — mixed loads

Truck loaded with round tubes and square hollow sections for delivery
A mixed load of round tubes and SHS leaving for the port leg. Mixed-size containers are standard for trial orders — one truck, one container, several specifications.

Night loading — H beam & tubes to port

H beam and square tube bundles loaded at night for the port run
Night runs beat city traffic restrictions for oversize loads. Beams are strapped in tiers; the container gets stuffed the same night with photos taken at each step.

Oversize H beam move

Oversize H beam bundles transported by night through Foshan
Long H beams move at night when road restrictions lift. Loading supervision with photos and videos is included with every order — you see the steel, the packing and the container condition before the doors close.

On the road — H beam to port

H beam shipment on a truck heading to the container port at night
Port run in progress. After stuffing, we send the loading record: container number, seal number, weight ticket and photos — the set your customs broker will ask for.

What ships with every order

  • EN 10204 3.1 mill test certificate (heat-number traceable)
  • Loading photo and video set: steel, packing, container number and seal
  • Weighbridge tickets matching the invoiced weight basis
  • SGS / BV / TUV third-party inspection on request
  • Export documents: customs declaration, CO / FORM E where applicable

Start your own shipment

Send your size list to [email protected] or WhatsApp +86 191 5745 8011 — itemized EXW / FOB quote within 24 hours, MOQ 5 tons, mixed sizes in one container for trials. More about our operation on the About page and the China buying guide.