Quick Answer

Scaffold tube is 48.3 mm OD with 3.2 mm (standard) or 4.0 mm (heavy duty) walls per EN 39 β€” Q235/S235JR steel, hot-dip galvanized inside and out for rental fleets. A 40GP container takes 26–27 t β‰ˆ 3,000–3,300 pieces of 6 m Γ— 3.2 mm tube. Ringlock and cuplock system components use the same base tube cut and forged to fit.

Scaffolding is one of the most repeat-purchase steel products in the trade: rental fleets grow, systems wear, and every market has its scaffolding makers buying tube by the container. The spec is deceptively simple β€” one diameter, two walls, one finish β€” but the details decide whether your tubes survive ten rental cycles or three.

The Sizes (There Are Only Two That Matter)

WallStandardWeight (kg/m)Pieces per 40GP (6 m)Order For
3.2 mmEN 39 light / JIS STK4003.56β‰ˆ 3,300Standard scaffolding β€” the volume product
4.0 mmEN 39 heavy / STK5004.37β‰ˆ 2,700Heavy-duty shoring, faΓ§ade systems
  • OD 48.3 mm (1.9") β€” universal coupling compatibility worldwide; Β±0.5 mm tolerance.
  • Lengths: 6 m standard; 1.5–3 m for ledgers/standards in system scaffolds; cut-to-length available.
  • Steel: Q235 / S235JR for 3.2 mm; S355JR or STK500-class for 4.0 mm heavy duty.

Galvanizing: The Decision That Sets Tube Lifespan

FinishPrice vs BlackRental LifeVerdict
Black (oiled)baseline1–3 cycles before rust complaintsPaint yourself, or leave it
Pre-galvanized+8–15%5–8 cycles; seam zone rusts firstBudget systems, dry regions
Hot-dip after fabrication+25–40%10+ years, all surfaces incl. insideThe rental-fleet standard

Rental economics: HDG tube costs ~$1.3 more per meter but survives a decade of outdoor yards and job-site abuse β€” the fleet math favors it every time. See the full comparison in galvanized vs black pipe.

System Scaffolds: Ringlock & Cuplock

  • Ringlock (rosette): standards from the same 48.3 tube with rosettes forged on; ledgers/braces with wedge heads. We supply base tube cut to system lengths or complete component kits.
  • Cuplock: cups welded on standards at 500 mm pitch; ledger ends form the lock. Same base tube, 3.2 mm walls typical.
  • Accessories: base jacks, swivel clamps, planks β€” order alongside tube to fill the container.

Container Math for Scaffold Makers

A 40GP with 26–27 t of 6 m Γ— 3.2 mm HDG tube β‰ˆ 3,000–3,300 pieces β€” roughly 18–20 km of tube. Mixing tube (60%) with system components and jacks (40%) is the usual container recipe. MOQ 5 t; bundles of 91 pcs (about 2 t) strapped for crane handling. Pipe range: steel pipe products β†’

Building scaffold stock? Price the container.

Wall thickness, finish (HDG/pre-galv/black) and quantity to [email protected] or WhatsApp +86 191 5745 8011 β€” FOB/CIF quotation with container loading plan in one working day.

Request Scaffold Tube Quote